A large open warehouse with a bright solid-color coated floor
Ocala Epoxy Professionals

Warehouse floors for Ocala distribution and storage space

Ocala Epoxy Professionals coats warehouse, distribution and storage floors in Ocala and Marion County, including space along the I-75 and US 27 corridors. Call to talk it through, or send the basics and someone will walk the building before quoting.

Warehouse floors: example floors

a light coated floor in a large warehouse
Example: a light coated floor in a large warehouse
a flake floor in a long open service building
Example: a flake floor in a long open service building
a blue coated floor in a storage and parts area
Example: a blue coated floor in a storage and parts area

Example photos of finished commercial floors, shown for the look. Not photos of a specific Ocala Epoxy Professionals job. Ask for photos of comparable work on the walkthrough.

What matters on a warehouse floor?

Abrasion from forklifts and pallet jacks, dust from bare concrete, clear lanes and a schedule that keeps product moving.

Bare concrete dusts as it wears, and that dust ends up on product and equipment. A coating seals the surface. The system is chosen for the wheels that cross it, and lanes and zones can be marked into the floor at the same time.

01

Forklift traffic

Hard wheels and turning loads call for a thicker, harder-wearing build.

02

Dust control

A sealed floor stops concrete dust from settling on stock.

03

Lanes and striping

Aisles, walkways and staging zones marked into the coating.

04

Brighter space

A light-colored floor reflects more light across the building.

Can the floor be done with racking still in place?

Often, by working around the racking or one aisle at a time, but anchors and base plates need a plan on the walkthrough.

Many buildings cannot empty the racks. The coating can stop neatly at base plates, or racks can be moved section by section. Say what can move and what cannot, and the plan is built around it.

01

Around base plates

Neat edges at anchors where racks stay put.

02

Section by section

Clear an aisle, coat it, move on.

How is a warehouse floor priced?

Per project, after a walkthrough. The slab, the system and the schedule change the cost more than the size alone.

You get a written price and a plan before anything is booked. The walkthrough and quote are free.

01

The existing floor

Old coatings, tile, adhesive or oil-soaked concrete all add removal and prep.

02

The system

What the floor has to handle decides the build and its thickness.

03

Scheduling

Night, weekend or phased work changes the labor plan.

How does the project run?

1

Walkthrough and written quote

Someone walks the space with you, asks how it is used and cleaned, checks the slab and talks through your hours. You get a written price and a plan before anything is booked.

2

Moisture test

The slab is tested before a system is chosen, because moisture coming up through concrete is a common reason coatings lift.

3

Prep

Old coatings, adhesive and oil come off, and the surface is diamond-ground with dust collection so the system bonds into the concrete.

4

Repairs, drains and edges

Cracks and joints are repaired, and coving and drain details are built where the space needs them.

5

Coating system

The base, the color or texture and the topcoat go down, zone by zone if the schedule calls for it.

6

Handover

You walk the floor and get care notes and the times when each area can take people, carts and full use.

    Rather just ask?(352) 820-2094
    FAQ

    Questions owners and managers ask

    Can you work while we keep shipping?

    Often, yes. Work can be phased one zone or aisle at a time, or done on nights and weekends. Cure times decide when each section can take foot traffic and then forklifts, so the schedule is set on the walkthrough and written into the quote.

    Will the coating stand up to forklifts?

    A system built for forklift traffic can. Thin coatings and paint wear quickly under hard wheels and turning loads. Tell the crew what equipment runs on the floor and how often so the build and thickness can be matched to it.

    Can you add aisle and safety striping?

    Yes. Walkways, forklift lanes, staging areas and other markings can be built into the coating system so they are sealed under the topcoat rather than painted on top.

    (352) 820-2094

      When? (optional)
      What? (optional)
      CallGet a free quote